top of page
ato logo 1.png

Lekki Conservation Centre

ATO Architects designs sustainable low-budget office for Nigerian Conservation Foundation.

After ATO’s winning entry to a competition to design an office complex at Mosley Road, Ikoyi for the Nigerian Conservation Foundation (NCF), the foundation opted to embark on a low budget office complex at their conservation park in Lekki. ATO’s design response to the brief was to create a building, which displayed sensitivity to the sustainability of the environment. Because of the poor swampy ground conditions of the site, ATO’s approach was to design a building floating off the ground on large foundation pads, which distribute the building load rather than using pile foundation, which would have created a more rigid form.
The initial design of the building incorporated solar panels on the building roof to provide an alternative energy source, as part of the overall approach to sustainability and green architecture. This had to be omitted from the design due to cost implications.

Project Highlights

Client Name

LCC

Project Period

1997


Principle Architect

Ayoola Onajide

Sector

Hospitality & Leisure

Project Fees

$1.3 Million

Scope of Work

Design

Location

Lagos, Nigeria

ATO Architects Limited

Contact

Location

Lagos Office: 12 Ladi Alakija Way, Lekki Phase 1, Lagos, Nigeria

Abuja Office: Suite A6, Tsukunda House, Plot 1446, Central Business District

Follow

  • Instagram
  • Facebook
  • LinkedIn

© 2025 by ATO Architects.

An ISO 9001-2015 Company

bottom of page